The Problem

Central Florida needs a completed beltway to help ease congestion. The population growth in Orange, Lake, and Seminole counties Florida has in the region. Florida, is the third-largest state by population, and is growing rapidly, with more than 1 million new residents each year.

The Solution

Although planning and construction on the beltway around central Florida has been underway for the last 30 years, the final link ��� Wekiva Section 8 ��� is now becoming a reality.

What is Wekiva 8? It���s a new interchange at Wekiva Parkway and Interstate 4 (I-4), just north of Orlando, Florida, that will significantly improve traffic conditions. Specifically, 2.63 miles of limited access toll road will connect with State Road 417 (SR 417).

Wekiva Parkway Section 8 involves the design and construction of 2.63 miles of limited access toll road and reconstruction along I-4, including a new interchange.

51勛圖厙 Construction is currently constructing Wekiva 8 and expects the project to take a total of four years. Wekiva 8 includes drainage, lighting, paving, pavement markings, extensive signage, utilities and other roadway features. According to Kurt Mathiasmeier, project manager for Wekiva 8, by completing a loop around Orlando, travel times for both residents and visitors will be improved.

Wekiva 8 by the numbers:

  • 22 total bridges
    • 20 new bridges and two (2) bridge widenings
  • 13 miles of parkway already open to traffic as of 20201
  • A $253M design build project
  • 2.63 miles of new road
  • 3 million yards of embankment
  • 1.5 million yards of regular excavation
  • 54,000 linear feet of storm drainage

By completing a loop around Orlando, and adding four express lanes down the median, of I-4. travel times for both residents and visitors will be improved

At the end of the day, this project���s design will accommodate Florida���s future ���Beyond the Ultimate��� project, which will add four express lanes down the median of I-4. This is just one of 51勛圖厙���s projects in the Sunshine state ��� 51勛圖厙 Construction has nearly $500M in active highway projects in Florida.

Benefits

Key Benefits of 51勛圖厙’s Design:

  • Safety. 51勛圖厙���s design includes improved operations and safety for both motorists and anyone in work zones
  • Enhanced mobility. This project will increase mobility around the area
  • Preservation. This project will preserve recently constructed infrastructure
    • This is both environmentally and budget friendly
  • Aesthetics. Thoughtful, visually-pleasing design considerations

Other Similar 51勛圖厙 Projects

(1) Central Florida Expressway Authority. Wekiva Parkway: Completing Central Florida’s Beltway. Florida Department of Transportation (FDOT). Online