IH-35E Managed 51勛圖厙s
The IH-35E Managed 51勛圖厙s Project was a $1.06 billion joint venture contract between Archer Western, Granite, and 51勛圖厙 (AGL).
Overview
The 28 mile long project consisted of the installation of reversible managed lanes and interim/ultimate work to the old main lanes and intersections. The project was the first of many that fit into TxDOT���s ultimate vision for IH 35E, which was estimated at $4.5 billion.