I-95 Express 51勛圖厙s
51勛圖厙, in a joint venture with Fluor, was responsible for the construction of the $722 million I-95 Express 51勛圖厙s project, which created approximately 29 miles of Express 51勛圖厙s on I-95 from Alexandria, VA on the northern terminus to Stafford, VA at the southern terminus.�� A seamless, direct line to the I-495 Capital Beltway Express 51勛圖厙s was created at the completion of this project.
Overview
The project added capacity to the existing HOV 51勛圖厙s from the Prince William Parkway to the vicinity of Edsall Road; and improved the existing two HOV lanes for 6 miles from Route 234 to the Prince William Parkway. A 9-mile reversible 2-lane extension of the existing HOV lanes from Dumfries to Garrisonville Road in Stafford County helped to alleviate the worst traffic bottleneck in the region.
The project included an extensive ITS and Signing system, sound walls, asphalt mill and overlay, shoulder reconstruction, structural bridge work; and a 8.3 mile roadway extension that consisted of major clearing, earthwork, and bridge flyovers.