The $238 million design-build project includes critical infrastructure upgrades to a key segment of I-75, a major corridor for freight and passenger traffic through North Central Florida.

96%
reduction in northbound I-75 delays
88%
reduction in southbound I-75 delays

Overview

Project work includes improvements to provide auxiliary lanes between interchanges on I-75 from S.R. 200 to S.R. 326, bridge replacements, milling and resurfacing, noise walls, a new interchange at 49th Street, and interchange modifications to S.R. 40 and S.R. 326.

Construction is scheduled to begin in early 2026 and take 3 years to complete. The improvements are part of the Florida Department of Transportation���s Moving Florida Forward Infrastructure Initiative, which promotes investment in safer, more efficient highways across the state.

Technical Highlights

  • 2 new lanes (1 each direction on I-75) between interchanges on I-75 from S.R. 200 to S.R. 326
  • 1 bridge replacement over I-75
  • 2 new bridges over I-75 at 49th Street with Ocala Gateway Aesthetics and Lighted Pylon Structures
  • 1 new Double Diverging Diamond interchange at 49th Street over I-75
  • Interchange modifications to S.R. 40 and S.R. 326 at I-75
  • Milling and resurfacing throughout
  • Noise walls

BENEFITS/POSITIVE ASPECTS TO COMMUNITY

  • Roadway widening and resurfacing to improve capacity and ride quality
  • Upgraded shoulders and medians to enhance safety and aid with hurricane evacuations
  • Drainage and stormwater improvements
  • Interchange enhancements for smoother traffic operations and improved accessibility to distribution centers