I-75 Improvements from S.R. 200 to S.R. 326
The $238 million design-build project includes critical infrastructure upgrades to a key segment of I-75, a major corridor for freight and passenger traffic through North Central Florida.
96%
reduction in northbound I-75 delays
88%
reduction in southbound I-75 delays
Overview
Project work includes improvements to provide auxiliary lanes between interchanges on I-75 from S.R. 200 to S.R. 326, bridge replacements, milling and resurfacing, noise walls, a new interchange at 49th Street, and interchange modifications to S.R. 40 and S.R. 326.
Construction is scheduled to begin in early 2026 and take 3 years to complete. The improvements are part of the Florida Department of Transportation���s Moving Florida Forward Infrastructure Initiative, which promotes investment in safer, more efficient highways across the state.
Technical Highlights
- 2 new lanes (1 each direction on I-75) between interchanges on I-75 from S.R. 200 to S.R. 326
- 1 bridge replacement over I-75
- 2 new bridges over I-75 at 49th Street with Ocala Gateway Aesthetics and Lighted Pylon Structures
- 1 new Double Diverging Diamond interchange at 49th Street over I-75
- Interchange modifications to S.R. 40 and S.R. 326 at I-75
- Milling and resurfacing throughout
- Noise walls
BENEFITS/POSITIVE ASPECTS TO COMMUNITY
- Roadway widening and resurfacing to improve capacity and ride quality
- Upgraded shoulders and medians to enhance safety and aid with hurricane evacuations
- Drainage and stormwater improvements
- Interchange enhancements for smoother traffic operations and improved accessibility to distribution centers